What happens after subscribing to the House Photovoltaic Verde 2024 program? Step by step


Ce se întâmplă după înscrierea în programul Casa Verde Fotovoltaice 2024? Ghid pas cu pas

After being able to register The Green Photovoltaic House Program 2024The following steps are essential to benefit from the subsidy offered by the state. Here’s what happens later and what you have to expect for the process without hitches.

1. Control of the admissibility and file analysis

After completing the online registration and sent all the necessary documents, your file inserts the phase of Eligibility control. The administration of the Environmental Fund (AFM) will analyze the loaded information, such as:

What happens after subscribing to the House Photovoltaic Verde 2024 program? Step by step

  • Identity documents And the documents that prove to be the owner of the building.
  • Tax documents (Tax certificate) which shows that you have no debts for the local budget.
  • Other documents required, according to the specific situation.

This evaluation phase is essential, because any error or lack of documents can lead to the refusal of the file. AFM has the right to request further clarifications or documents if it finds in vantance.

2. The approval of the file and the list of approved candidates

If the folder is approved, you will be included on List of approved candidateswhich will be published on the AFM website. This is a very important phase, because only the beneficiaries in this list can continue with the installation process of photovoltaic panels.

Important: Do not make any payment to the installation program before seeing that your file is in the approved list!

3. Choose the installer and sign the contract

After being approved, you will work with a Authorized installervalidated by AFM. They are responsible for the installation of photovoltaic panels on your property. The main passages include:

  • Choose an installer from the list of validated installers of AFM. It must be authorized to participate in the program.
  • Sign one contract with the installer. The contract includes the technical details of the project, the total costs and your financial contribution of 2,000 she (the rest covered by the state subsidy).

What do you need to know about authorized installers:

  • The chosen installer must offer you the right technical solution for your home, including the correct sizing of the panels based on energy needs.
  • AFM directly resolves the amount of the financing to the installer, so you will only pay your contribution.

Installation of photovoltaic panels in Bucharest through the Green House programming 2024

4. Installation of photovoltaic panels

After signing the contract and obtaining the final approval, the installer will plan Assembly of photovoltaic panels. This phase provides for the following:

  • The installation itself equipment on your property, including their connection to the house electricity grid.
  • Tests and operate of the system to make sure everything works correctly.

The duration of the installation depends on the complexity of the project and the availability of the installer, but generally ends within a few days.

5. Inspection and reporting to AFM

After the installation of the panels, the installer is required to send to AFM to Finalization relationship To confirm that all the works were performed according to the standards established. This includes:

  • Photos and technical documents that demonstrate the correct installation.
  • Details on the energy and energy production estimates installed.

AFM will evaluate the report and, if all goes well, will authorize the subsidy to the installation program.

6.

The last phase is settlement The financing offered by the state. AFM will pay the amount directly to the installation program Up to 20,000 shecovering most of the installation costs. It is not necessary to do anything at this stage, but it is important to verify that all documents and relationships are sent correctly by the installer.

7. Savings for energy and monitoring the bill

After installing and activating the photovoltaic panels, you will begin to benefit from the energy produced by the system. Depending on the size of the installation and weather conditions, you will see a A significant reduction in electricity bills. Also:

  • You can Deliver the energy surplus Produced in the national network, for which you will receive financial compensation.
  • The system requires minimal maintenance, but it is useful to periodically monitor the production of energy to make sure it works optimally.

After joining The Green Photovoltaic House Program 2024The process of verification, approval and installation can take several months, but the long -term results – substantial savings on energy invoices and a positive impact on the environment – is worth it. Make sure to collaborate with authorized installers and to respect all the phases to benefit from the subsidy up to 20,000 she.

latest posts published

Rental price of the photovoltaic roof

Rental price of the photovoltaic roof

The calculation of the rental speed of a photovoltaic roof is not based on a ...
Climate and resilience and photovoltaic law: 3 -point regulations

Climate and resilience and photovoltaic law: 3 -point regulations

These regulatory adjustments will apply according to a rigorous calendar:From 1 January 2023: The new ...
Solar panel: optimal inclination and orientation [2025]

Solar calculation panels of the surface: the formula!

The production of your solar energy inspires you and rightly: saving savings while injecting clean ...
Optimizing electricity consumption with the Ecojoko monitoring application

Optimizing electricity consumption with the Ecojoko monitoring application

Introduction: the growing need to optimize electricity consumption In a world where energy management becomes ...
Photovoltaic kit

Photovoltaic kit or sun installation: for what do you use?

When you plan to buy solar panels as a production of electricity of renewable origin, ...
Construction site for a photovoltaic agricultural hangar

Financia your agricultural photovoltaic hangar thanks to solar

The storage of cereals or equipment, stalls or equestrian Merry -Go -Round ... The photovoltaic ...
Photovoltaic connection: cost, obligation and operation

Photovoltaic connection: cost, obligation and operation

Do you want to install solar panels on the roof of your home or on ...
dpe et panneau solaire

DPE and Solari panels: know the whole 2025

You have one or more accommodation you want Improve the DPE ? With the prohibition ...
Photovoltaic simulator: calculates solar profitability at home

Passive House: Construction and profitability price

A heated house thanks to the heat released by the activity of its occupants, domestic ...
Huawei Afci functionality

Huawei Afci functionality

In a short time, the Huawei Sun2000-100ktl-M1 photovoltaic inverter has been able to attract the ...

Leave a Reply

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *