From 8 November 2019, the Energy and climate law has brought its share of changes to the construction of the legislation. Direct consequence, the article L111-18-1 of the urban planning code requires the construction of any building and a socket on the ground greater than 1000 m² The obligation to be provided with a system of energy and thermal performance production on at least 30% of its available surface. This is where photovoltaics play an important role by establishing themselves as an interesting solution.

Among the buildings concerned, those that host a Installation classified for environmental protection (ICPE) It can also be subject to this obligation. But which and in what conditions?

ICPE photovoltaic solar land

In this article «Photovoltaic Icpe» we tell you everything you need to know:

  • Photovoltaic obligation : Which buildings and which sections are interested?
  • Management : What orders in force for which ICPE?
  • Safety : What requirements for photovoltaic ICPE?

1. Photovoltaic obligation: which ICPE buildings are worried?

From 9 November 2019, an installation classified for environmental protection (ICPE) will be subject to the obligation, among other things, to install a renewable energy production system, if:

  • This is a New construction (The law is not retroactive)
  • This requires obtaining a construction permit
  • Which is or not to a commercial operational authorization
  • It is an ICPE built inside a building The hand handle is greater than 1000 m² (Spessors of the walls, additional structures but also parking areas included)

However, there is a list of exclusions that grant an exemption for ICPE in the sections mentioned below:

  • 1312, 1416 et 1436
  • 2101 to 2150 (in the case of a request for urban planning authorization after 29 February 2020)
  • 2160, 2260-1 2311, 2410 et 2565
  • 27xx (except 2715, 2720, 2750, 2751 and 2752)
  • 3260 et 3460
  • 35xx
  • 4xxx

They are also considered «out of reach»:

  • ICPE with photovoltaic shades separated from the main buildings from an open space greater than 10 meters
  • ICPE whose safety devices occupy more than 70% of the roof
  • ICPE in the event that the available coverage surface (after the exclusion of all the requested surfaces) proved to be less than 30% of the total roof surface

Does the ICPE building control all these boxes and is not subject to possible exemptions?

This means that you are obliged to equip 30% of the building’s roof surface in favor of the environment with for example, a Photovoltaic installation on the business or construction roof. It is also possible to install photovoltaic shades on parking areas (in accordance with the article L111-18-1 of the urban planning code).

Note:

Obligation or not, photovoltaics remains an interesting investment!

If the production of photovoltaic electricity has established itself as the perfect response to meet state expectations, it is also At the top of the most profitable, sustainable and ethical investments. Install not only photovoltaic solar panels help to anticipate the next environmental measures and achieve the CSR objectives of your business, but the electrical production produced also generates economies and additional income.

And there is no lack of other advantages: where some electrical production systems can be noisy, solar installations have no impact on the convenience of the neighborhood that could even provide solar energy through a transition by the public network (for collective consumption).

2. The supervision of a photovoltaic ICPE

ICPE photovoltaic solar land

The design offices, architects and CSR managers often face very dense specifications when it comes to orchestrate the construction of ICPE where a Hardening of security requirements It has been particularly felt in recent years.

But fortunately, photovoltaics quickly adapted to facilitate its insertion in the heart of an ICPE project.

The orders that frame the installation and functioning of photovoltaic electricity within the ICPE are two in number:

These orders list Minimum safety requirements for the prevention of accidental risks within the icpe subject to authorization. This concerns the buildings equipped with photovoltaic installations on their roofs, their facades or even on the ground.

3. Security requirements in the photovoltaic icpe

In fact, the operating conditions will be defined in advance in order to understand the risks involved by the nature of the activity carried out within the building. The presence of a photovoltaic installation will be subject to fairly general requirements since they are common to any building that houses photovoltaic solar panels.

In general, the measures written in the two decrees in force are focused on:

  • Fire risk
  • Collateral risks of electric shocks and warm

In order to act in the face of these risks, the operator of an ICPE must:

  • Write and make technical documents available that would be useful for the intervention by emergency services
  • Install an alarm system in each production unit, as well as the related cutting devices.
  • Show supervision by correctly protecting the electrical parts: inverter of photovoltaic installation, batteries and other equipment
  • Create a visible and obvious report
  • Facilitate access to neighboring water points (to promote the intervention of the aid to pump)

Tertiary company equipped with 1,172 m² of photovoltaic panels for the roof

A photovoltaic Icpe in the project?

Identify its future position and calculates its profitability in 2 minutes!

Start the simulation

latest posts published

Rental price of the photovoltaic roof

Rental price of the photovoltaic roof

The calculation of the rental speed of a photovoltaic roof is not based on a ...
Climate and resilience and photovoltaic law: 3 -point regulations

Climate and resilience and photovoltaic law: 3 -point regulations

These regulatory adjustments will apply according to a rigorous calendar:From 1 January 2023: The new ...
Solar panel: optimal inclination and orientation [2025]

Solar calculation panels of the surface: the formula!

The production of your solar energy inspires you and rightly: saving savings while injecting clean ...
Optimizing electricity consumption with the Ecojoko monitoring application

Optimizing electricity consumption with the Ecojoko monitoring application

Introduction: the growing need to optimize electricity consumption In a world where energy management becomes ...
Photovoltaic kit

Photovoltaic kit or sun installation: for what do you use?

When you plan to buy solar panels as a production of electricity of renewable origin, ...
Construction site for a photovoltaic agricultural hangar

Financia your agricultural photovoltaic hangar thanks to solar

The storage of cereals or equipment, stalls or equestrian Merry -Go -Round ... The photovoltaic ...
Photovoltaic connection: cost, obligation and operation

Photovoltaic connection: cost, obligation and operation

Do you want to install solar panels on the roof of your home or on ...
dpe et panneau solaire

DPE and Solari panels: know the whole 2025

You have one or more accommodation you want Improve the DPE ? With the prohibition ...
Photovoltaic simulator: calculates solar profitability at home

Passive House: Construction and profitability price

A heated house thanks to the heat released by the activity of its occupants, domestic ...
Huawei Afci functionality

Huawei Afci functionality

In a short time, the Huawei Sun2000-100ktl-M1 photovoltaic inverter has been able to attract the ...

Leave a Reply

Tu dirección de correo electrónico no será publicada. Los campos obligatorios están marcados con *